Solar + Storage: Powering Data Centers with ZEO Energy CEO Tim Bridgewater

Solar + Storage: Powering Data Centers with ZEO Energy CEO Tim Bridgewater

22:01 Mar 4, 2026
About this episode
At Intersolar San Diego, Sean talks with Tim Bridgewater, CEO of ZEO Energy, about the company’s shift from 100% residential solar into behind-the-meter solar-and-storage solutions for large loads like data centers. Bridgewater shares ZEO Energy’s growth path (including acquiring Synergy Solar and Heliogen and going public in March 2024) and announces an MOU for a 280 MW solar farm with energy storage in central Utah to power a data center. They discuss surging U.S. data center demand, why on-site solar plus storage can be built faster than gas or nuclear, the industry move toward 800V DC power systems, and current tax-credit timelines and incentives affecting residential solar, large-scale projects, and standalone storage.    Topics covered:  ZEO = Greek word “Zeal” means energy  Synergy Solar  280-megawatt facility = large solar farm with data storage  Behind the meter power solutions  NEC Article 691  Chip Technology  800 volts DC  Tax Credit  NVIDIA  Data centers  Permitting process  Nasdaq  Heliogen  Inflation Reduction Act  Energy Communities    Reach out with Tim Bridgewater here:  LinkedIn: https://www.linkedin.com/in/timothy-a-bridgewater-347b062/   Website: https://zeoenergy.com/     Learn more at www.solarSEAN.com and be sure to get NABCEP certified by taking Sean’s classes at:  www.heatspring.com/sean   www.solarsean.com/ess
Select an episode
0:00 0:00