Wildcat Resources: Tabba Tabba Lithium PFS, Costs, and Funding Outlook | AJ Saverimutto
HomeRock Stock Channel › Episode

Wildcat Resources: Tabba Tabba Lithium PFS, Costs, and Funding Outlook | AJ Saverimutto

35:11 Oct 16, 2025
About this episode
In this episode, we sit down with Ajanth (Aj) Saverimutto, Managing Director of Wildcat Resources (ASX: WC8), to discuss the company’s Tabba Tabba lithium project in Western Australia, recent exploration at Bolt Cutter Central, and what the latest pre-feasibility study (PFS) implies for costs, scale, and timelines. What we cover - Project overview: Why Tabba Tabba’s location near Port Hedland and tier-one Pilbara lithium mines matters for logistics and costs. - Acquisition story: How Wildcat secured the asset and accelerated drilling to reach resource, reserve and PFS milestones. - PFS takeaways: Base-case design, contingencies, strip assumptions, and the rationale for a staged ramp-up. - Costs & scale: Headline Capex/Opex, targeted 5.5% spodumene concentrate, recoveries, and throughput steps (2.2Mtpa → 4.5Mtpa). - Mining plan: Predominantly open pit with later underground; implications for mine life and cash flow sequencing. - Exploration upside: Early results at Bolt Cutter Central (stacked pegmatites) and potential additions from Chewy/Han/Hutt and tantalum. - Funding pathways: Debt, offtake/prepay, strategic and government options—and what counterparties are engaging. - Market context: How Pilbara cost curves, sentiment, and recent moves by majors frame risk and opportunity. Key numbers discussed (from the interview) - Capex (incl. pre-strip): ~A$680m (base case). - Unit costs: ~US$541/t C1 and ~US$650/t AISC (FOB basis discussed). - Production profile: Stage 1 ~300kt/y SC5.5 ramping to ~600kt/y in Stage 2. - Recoveries: ~70–80% (with conservative haircut in PFS). - Mine life: ~17 years initial plan (with potential extensions). - Mining mix: ~79% open pit / 21% underground over life. - Balance sheet & history: Last equity raise Nov 2023 (~A$100m @ A$0.76); cash balance discussed at ~A$55m at time of interview. About the guest AJ is a mining engineer and accountant with senior ops experience at Freeport-McMoRan’s Grasberg and BHP. He previously restarted and sold the Beta Hunt nickel-gold mine before joining Wildcat. Sponsors - Lithium Royalty Corp (TSX: LIRC) — diversified lithium royalty portfolio. (Website: https://www.lithiumroyaltycorp.com/ | X: https://x.com/Lithium_Royalty ) - USCF Investments — commodity-focused ETFs (e.g., CPER copper, ZSB battery metals, USG gold, SDCI diversified commodities). (Website: https://www.uscfinvestments.com/ | X: https://x.com/USCFInvestments ) Chapters (00:00) Introduction (03:25) AJ's Background (05:35) Tabba Tabba Acquisition (07:30) Bolt Cutter Discovery (09:40) PFS Highlights (11:51) Capex, Opex & Output (13:17) Resource Upside (14:2
Select an episode
0:00 0:00